The medium- and low-voltage data power module is a prefabricated, integrated power supply and distribution unit specifically developed for data centers, computing centers, and intelligent computing centers. It is designed to address issues associated with traditional power infrastructure construction, such as long lead times, complex interface coordination, and poor environmental adaptability. Its core advantage lies in the factory-based integration, commissioning, and packaging of complex power distribution systems, enabling "plug-and-play" functionality upon arrival at the site.
Product Description
Core Functions and Composition
This module integrates the entire power chain—from input to distribution—and comprises the following key components:
Medium-Voltage Distribution Unit: Typically includes 10kV medium-voltage switchgear responsible for receiving and converting high-voltage power.
Transformation and Low-Voltage Unit: Includes transformers and low-voltage distribution cabinets to step down voltage to the 380V required by data centers and manage precise power distribution.
Emergency and Energy Storage Systems: Integrates UPS (Uninterruptible Power Supply), DC-UPS, and lithium-ion energy storage modules to ensure power continuity.
Auxiliary Monitoring Systems: Features built-in precision air conditioning, fire safety and security systems, environmental monitoring, and visualization management systems to ensure a safe and stable operating environment.
Core Advantages
Significantly Enhanced Deployment Efficiency: Reduces on-site workload by over 70%, compresses deployment time from months to days, and cuts on-site labor requirements by more than 60%.
Superior Safety and Reliability: Supports multiple redundancy configurations (such as 2N and N+1) to meet the power continuity requirements of high-tier data centers; prefabricated copper busbar connections reduce line losses by nearly 1%.
Convenient O&M: Core power modules support hot-swapping, enabling maintenance without system downtime, while the built-in intelligent monitoring system allows for remote monitoring of end-to-end power data.
Application Value
Compared to traditional on-site construction methods, the factory-prefabricated nature of these modules effectively avoids drawbacks such as weather-related delays and ambiguous accountability arising from multi-party cross-operations. Their standardized design ensures controllable construction schedules; on-site work is limited to hoisting and interface connections, thereby drastically improving the delivery efficiency and reliability of data center power infrastructure.
Want to Learn More
Click Below to Learn About PUSHEN
Custom Service
Specialized modular prefabricated cabins, utilizing the industry's most advanced manufacturing processes.
Our customization capabilitiesCase
Specialized modular prefabricated cabins, utilizing the industry's most advanced manufacturing processes.
Learn more caseContact Us
Specialized modular prefabricated cabins, utilizing the industry's most advanced manufacturing processes.
Get in touchRelated Products
Related News
Oct. 29, 2026
Weatherproofing and Environmental Protection for Outdoor Data Center E-Houses
Outdoor data center E-Houses must protect servers, batteries, switchgear, and control systems from rain, dust, heat, and corrosion. A reliable design combines an outdoor data center enclosure, thermal management, and corrosion protection. The right weatherproofing plan also uses an IP rating, drainage system, insulation, and tested HVAC equipment. These measures help reduce downtime, maintenance
Oct. 28, 2026
How Data Center E-Houses Support Hyperscale Data Center Expansion
Expanding a hyperscale data center requires speed, electrical reliability, predictable quality, and minimal disruption to live operations. In this guide, we explain how Pushen Data Center E House solutions can simplify the process—from load planning and factory design to FAT, transport, site installation, and commissioning. By following the steps below, data center developers can shorten
Get a free quote anytime
If you would like to learn more about our products or are looking for a suitable prefabricated cabin solution, please contact us.