Products Categories
Pushen, as China E House Manufacturer, provides prefabricated electrical buildings for power distribution, substations, renewable energy, industrial facilities and other projects requiring factory-built electrical equipment spaces.
Each building is engineered around customer-specified switchgear, control panels and electrical equipment rather than being limited to a standard container layout. Building dimensions, equipment clearances, cable routing, access, ventilation and transportation requirements can all be considered during project design.
Also commonly referred to as a prefabricated electrical house or modular electrical house, this factory-built approach moves a significant portion of structural fabrication away from the jobsite, helping reduce on-site construction and support faster project delivery.
Pushen supports different structural configurations according to equipment quantity, project footprint, transportation restrictions and installation requirements.
A single-module electrical building provides a compact factory-prefabricated enclosure for switchgear, control panels and other project-specified electrical equipment.
It is suitable for projects where equipment can be arranged within one transportable structure and rapid site installation is required.
Typical considerations include:
MV/LV switchgear layout
Equipment mounting and foundations
Front and rear maintenance clearance
Cable entry and routing
Doors and equipment access
Grounding and lighting
Ventilation and HVAC interfaces
Lifting and transportation
View the Single-Module Electrical Building.
For power transformation and distribution projects, Pushen provides prefabricated substation structures designed to accommodate project-specified electrical equipment within a modular building.
Factory prefabrication can simplify structural construction and reduce the amount of work required after equipment arrives at the project site.
Explore the Prefabricated Substation.
When site footprint is limited or a project requires a larger amount of electrical equipment, a multi-story configuration can provide additional usable space without proportionally increasing the ground area.
Equipment, cable routes, access and structural interfaces can be coordinated between different levels according to the project layout.
View the Multi-Story Electrical Building.
A prefabricated electrical building should be designed around the equipment installed inside—not the other way around.
Pushen can develop the building structure according to customer-provided electrical drawings, equipment dimensions and project requirements.
Typical design inputs include:
| Design Item | Project Considerations |
|---|---|
| Equipment Layout | Switchgear, control panels and customer-specified equipment |
| Building Dimensions | Length, width, height and available site footprint |
| Maintenance Access | Front, rear and side operating clearances |
| Cable Entry | Bottom, side or project-specific cable entry |
| Cable Routing | Cable trays, openings and internal routing requirements |
| Equipment Mounting | Foundations, bases and mounting points |
| Ventilation | Equipment heat load and ventilation requirements |
| Access | Personnel doors, equipment doors and maintenance openings |
| Environmental Design | Temperature, humidity, wind, dust and corrosion conditions |
| Transportation | Module dimensions, lifting points, weight and shipping limitations |
This equipment-driven approach allows the modular electrical house to be adapted to different switchgear brands, electrical layouts and project environments.
Structural fabrication can take place in the factory while site foundations and other construction activities are progressing.
This allows off-site manufacturing and site construction to proceed in parallel rather than waiting for a conventional electrical room to be completed first.
Walls, roof, equipment bases, doors and other agreed structural components can be completed before delivery.
Depending on the project scope, selected auxiliary installations can also be prepared in the factory, reducing jobsite fabrication and coordination.
Manufacturing structural components in a factory environment provides better control over fabrication processes than performing the same work entirely at a construction site.
The prefabricated electrical house can be developed around actual switchgear dimensions, cable interfaces, maintenance clearances and environmental requirements.
Single-module, multi-module and multi-story configurations provide flexibility for projects with different equipment quantities and available footprints.
Building dimensions, module splitting, lifting and shipping requirements can be considered during engineering so that the completed structure can be transported to the project site efficiently.
Prefabricated electrical buildings can accommodate switchgear, protection and control equipment used in substations and power distribution projects.
Data center projects can use factory-built electrical rooms for MV/LV switchgear and related power distribution equipment, helping reduce dependence on conventional site-built electrical rooms.
Explore our Data Center E-House solutions.
Renewable energy projects often require remote electrical equipment buildings for power collection, distribution and control equipment.
Explore our renewable energy solutions.
Modular electrical buildings and equipment enclosures can support electrical and control equipment associated with battery energy storage projects.
Factories, processing plants, mining sites and other industrial projects can use prefabricated electrical rooms where electrical equipment must be protected and installed close to the process or load.
Factory-built electrical buildings are particularly useful where site labor, construction conditions or project access make conventional building work difficult.
Pushen supports project-specific configurations rather than limiting customers to a fixed building size or layout.
Customization can include:
Single-module or multi-module structures
Single-story or multi-story layouts
Equipment-specific internal dimensions
Equipment mounting foundations
Cable openings and cable trays
Personnel and equipment access doors
Internal partitions
Grounding arrangements
Lighting systems
Ventilation and HVAC interfaces
Lifting and transportation structures
Project-specific surface protection
Environmental design requirements
Final configurations are developed according to customer drawings, equipment specifications, site conditions and agreed supply scope.
Customers provide equipment drawings, dimensions, project conditions and functional requirements.
Building dimensions, equipment positioning, access, maintenance clearances and cable interfaces are reviewed.
The modular structure is developed according to equipment load, transportation and project requirements.
Steel structure, walls, roof, doors, equipment supports and agreed auxiliary components are manufactured and assembled.
The completed building is checked against approved project requirements before shipment.
The modular electrical building is prepared for transportation and subsequent positioning, connection and commissioning at the project site according to the agreed project scope.
To help us evaluate your project, please provide:
Electrical equipment list
Switchgear or control panel drawings
Equipment dimensions and weights
Required building dimensions
Internal layout
Maintenance clearance requirements
Cable entry and routing
Site temperature and environmental conditions
HVAC or ventilation requirements
Required quantity
Project destination
Transportation restrictions
Required supply scope
The more complete the project information, the easier it is to develop an appropriate prefabricated electrical building configuration.
A prefabricated electrical building is a factory-built modular structure designed to house switchgear, control panels and other electrical equipment. It is manufactured off site and transported to the project location for installation.
The terms are often used for similar products. An E-House generally refers to a prefabricated electrical building designed to accommodate electrical distribution, protection and control equipment. The exact supply scope varies by project.
Depending on the project, the building can be designed around MV/LV switchgear, control panels, protection equipment and other customer-specified electrical equipment.
Yes. Building dimensions, equipment bases, maintenance clearance, cable entry and access can be developed according to customer-provided equipment drawings and project requirements.
Yes. Large buildings can be divided into transportable modules when required by equipment layout, shipping restrictions or site access. Multi-story configurations can also be considered for projects with limited available footprint.
Typical applications include power transmission and distribution, data centers, renewable energy, energy storage, industrial facilities, mining and other infrastructure projects requiring protected electrical equipment spaces.
Need a prefabricated electrical building engineered around your switchgear and project requirements?
Send Pushen your equipment drawings, required building dimensions, internal layout, environmental conditions and project location. We can evaluate the requirements and develop a suitable modular electrical house configuration for your project.
Get a free quote anytime
If you would like to learn more about our products or are looking for a suitable prefabricated cabin solution, please contact us.