Products Categories
Pushen manufactures custom power equipment enclosures and modular power equipment containers for BESS, generator sets and industrial applications. We design prefabricated structures around your equipment dimensions and project requirements, helping equipment manufacturers and EPC contractors simplify equipment housing, transportation and on-site installation.
Pushen provides customized power equipment containers for battery energy storage, generator sets and industrial applications. Each enclosure is designed around the equipment layout and project requirements.
BESS Enclosures: Designed to house battery racks and supporting electrical equipment for energy storage projects.
Generator Enclosures: Customized for diesel and gas generator sets, with structural arrangements for ventilation, exhaust and equipment maintenance.
Industrial Power Equipment Enclosures: Designed to accommodate electrical, control and auxiliary equipment for industrial facilities.
The enclosure structure, dimensions and interfaces can be customized according to equipment specifications and installation conditions.
Different projects require different enclosure configurations. Buyers can select the appropriate solution based on the type of equipment and its application.
| Project Requirements | Recommended Container | Typical Application |
|---|---|---|
| Battery energy storage and supporting electrical equipment | Energy Storage Containers | BESS projects and energy storage systems |
| Diesel or gas generator sets requiring an integrated enclosure | Generator Equipment Containers | Backup power supply and industrial power generation |
For projects with special equipment configurations or installation requirements, Pushen can evaluate customized enclosure designs based on your drawings and specifications.
Pushen combines steel structure manufacturing with project-based customization to support different power equipment enclosure requirements.
Steel processing, CNC cutting and bending, welding, surface treatment and structural assembly.
Enclosure dimensions and structural details evaluated according to equipment drawings and project specifications.
Equipment layouts, access openings and auxiliary interfaces planned around project requirements.
Manufacturing processes supported by an ISO 9001:2015 quality management system.
With an MOQ starting at 1 unit, Pushen can evaluate individual equipment enclosure projects as well as larger orders.
Pushen evaluates each project based on customer drawings and equipment specifications. To start the customization process, please provide:
Equipment drawings, dimensions and weight.
Required enclosure dimensions and internal layout.
Cable, piping and ventilation requirements.
Operating environment and installation location.
Order quantity and delivery requirements.
Our team can then evaluate the structural design, equipment arrangement and manufacturing requirements before confirming the project specifications.
Yes. You can provide drawings and specifications from your equipment suppliers. Pushen can evaluate the enclosure structure and installation layout based on the supplied information.
Design adjustments can be evaluated during the project confirmation stage. It is recommended to finalize equipment dimensions, interfaces and structural requirements before approving the production drawings.
Transportation dimensions and lifting restrictions should be considered during the initial design stage. Depending on project requirements, modular construction and on-site assembly arrangements can be evaluated.
Different enclosure specifications can be discussed within one project order. Please provide the required models, quantities and drawings so the production and quotation arrangements can be evaluated.
Need a Custom Enclosure for Your Equipment?
Send Pushen your equipment drawings and project requirements for a customized enclosure assessment.
Send Your Project Details →Get a free quote anytime
If you would like to learn more about our products or are looking for a suitable prefabricated cabin solution, please contact us.