Custom Service
Structural customization
Prefabricated cabins are custom-designed and manufactured according to the actual needs of the project, adaptable to different scenarios, equipment, and transportation conditions.
Electrical system customization
Customized power systems for prefabricated cabins are produced based on the specific technical parameters and site conditions of the power project. Modular prefabricated cabins integrating various power equipment are custom-made and manufactured, representing the mainstream model in the current power construction field.
Functional customization
Modular steel structure cabins are pre-designed and manufactured in a factory according to specific functional requirements (such as power, energy storage, communication, temporary housing, etc.) with non-standard dimensions, load-bearing capacity, environmental protection, and internal layout requirements.
Prefabricated cabin customization process
Professional customization, quality witness
1
Requirement Analysis
2
Engineering Design
3
Manufacturing
4
Factory Assembly & Testing
5
Delivery & Installation
6
After-sales Support
Technical Capabilities
A fully traceable quality control system ensures zero-defect deliver
Engineering Design Capabilities
We have a professional engineering team capable of manufacturing prefabricated cabins according to customer drawings, including dimensions, materials, and special requirements. We can also customize cabin dimensions, structures, and functions to suit specific project needs.
Manufacturing Capabilities
The company has a 30,000-square-meter professional modular prefabricated cabin production workshop with 102 employees. The factory has a complete and efficient prefabricated cabin production line, with an annual production capacity of 9,000 sets of various camping cabins and prefabricated cabin units.
Quality Control Capabilities
The company has a strict production inspection process for quality control, from raw material inspection, production process control, cabin inspection to factory performance testing, with strict control at each stage. The company has passed three major management system certifications, providing customers with high-quality services and products.
Customization Advantages
Reduce on-site construction time
The customized prefabricated cabin adopts the "factory production + on-site rapid docking" model. The manufacturing of the cabin and the installation and debugging of internal electrical equipment can be carried out simultaneously with the on-site civil and foundation construction, shortening the overall construction period.
Complete site solution
The complete on-site solution for customized prefabricated cabins covers the entire process from solution design to operation and maintenance, with the core being customized around scene adaptation needs.
Flexible design
The core of the flexible design of customized prefabricated cabins lies in the trinity of "modularity, adaptability, and scalability"
Factory pre-commissioning
Factory pre-commissioning of customized prefabricated cabins is the core quality control link before leaving the factory. The core is to complete the full-function joint debugging of the entire cabin in the factory to avoid on-site commissioning risks
Get a free quote anytime
If you would like to learn more about our products or are looking for a suitable prefabricated cabin solution, please contact us.