Home / Case / 100MW Agricultural-Solar Complementary Photovoltaic Power Generation Project

100MW Agricultural-Solar Complementary Photovoltaic Power Generation Project

Share:

Project Background

The Guoneng Changyuan Badong 100MW Agricultural-Solar Complementary Photovoltaic Power Generation Project is located in Yanduhe Town, Badong County, Enshi Prefecture, Hubei Province. Developed by Guoneng Changyuan Badong New Energy Co., Ltd. (a subsidiary of China Energy Group Changyuan Electric Power), this project represents a landmark achievement in China's renewable energy infrastructure development.

The project achieved its initial grid connection on December 28, 2023, and reached full-capacity grid connection by November 26, 2024. With a total investment of approximately RMB 500 million (approx. USD 70 million), the installation covers an area of roughly 2,870–3,052 mu (192–203 hectares) of mountainous terrain.

Challenges Faced

Complex Mountainous Terrain

The project site presented significant geographical and environmental challenges:

Steep elevation changes across dispersed array zones requiring customized equipment layouts

Limited road access for heavy equipment transportation to remote installation points

Variable soil conditions demanding reinforced foundation designs for substations

Extended cable routing distances across irregular terrain increasing voltage drop risks

Tight Construction Schedule

The project operated under aggressive timeline pressures:

Construction commenced on May 18, 2023 with first grid connection target within 7 months

Full-capacity commissioning deadline of November 26, 2024 left no margin for delays

Coordinated delivery required across 180,000+ monocrystalline silicon PV modules simultaneously

18 km of transmission line construction needed to connect to the regional grid

Customized Solution Highlights – 110kV Step-Up Substation & Distribution System

Pushen Electric provided a comprehensive medium-voltage power distribution solution tailored specifically to the demands of this large-scale mountainous solar project:

110kV Step-Up Substation Package: A complete turnkey substation solution including high-voltage switchgear, power transformers, relay protection system, automation control system, and auxiliary power systems. The substation was designed with factory pre-integration to minimize on-site assembly workload in the challenging mountain environment.

Medium-Voltage Switchgear Array: Modular metal-clad switchgear units configured for the specific voltage requirements of the 100MW capacity, featuring intelligent monitoring capabilities for remote operation and fault diagnostics — essential given the remote location of the installation site.

Customized Cable Routing & Protection System: Engineered protection coordination across the 18 km transmission line corridor, including surge arresters, grounding systems, and automated fault isolation devices adapted to the region's lightning-prone climate conditions.

Project Outcomes

On-Time Full-Capacity Delivery

All power distribution equipment was delivered, installed, and commissioned on schedule, enabling the project to achieve its full 100MW grid connection target by November 26, 2024 — meeting the strict provincial milestone requirements without delay.

Reliable Operation in Mountain Environment

The customized insulation and climate control systems have ensured stable continuous operation despite the site's exposure to mountain weather conditions, including temperature extremes, high humidity, and occasional severe weather events common to the Enshi region.

Significant Environmental Impact

The completed project now generates approximately 118–120 million kWh annually, delivering substantial environmental benefits: saving around 38,500 tons of standard coal equivalent per year and reducing CO2 emissions by approximately 93,000–119,000 tons annually. The agricultural-solar complementary model enables continued farming activities beneath the PV arrays, maximizing land utilization efficiency.

Previous:

Qinhuai Data Center Integrated Energy Station 110kV Substation Project

Next:

Saudi Arabia 132kV Modular Substation Project

Get a free quote anytime

If you would like to learn more about our products or are looking for a suitable prefabricated cabin solution, please contact us.

*
*
*

WhatsApp

E-mail

andy@pushenchina.com

Wechat

Wechat

Back Top